Temporary Power Project Oman

Project

4MW Temporary Power Generation to the National grid at 33kV

Duration

1 Year

Industry

Utilities

BRIEF

Our customer is responsible for ensuring sufficient electricity and water is supplied at the lowest cost to meet the growing demand in the Sultanate of Oman. RSS was asked to provide additional temporary power to top-up the main grid supply.

SOLUTION

Working in partnership with the customer, and in additional to the stand-alone project in Jalan Banj Bu Ali, RSS provided a specific solution that provided an on-demand power supply with 24/7 availability, drawing up to 24MW at any time. It was linked to the Main Interconnected System (MIS) in the northern governorates of the Sultanate, bordering the United Arab Emirates.

SERVICE

Our large rental fleet allows us to mobilise equipment from our strategically located bases in the GCC. This ensures our solutions reach the customer without delay. Once our temporary power equipment is installed, we continue to ensure uncompromising service and maintenance throughout the life of the project by our:

  • Dedicated teams of fully qualified engineers

  • Dedicated operational leadership and account management

Email us on info@rss.ae if you have any feedback or questions. Thank you